Choose Your Plan:    
Base Price of Plan
HOME INTERIOR OPTIONS                   Add Desired Upgrades
Fireplace (42"" insert With Mantle) $ 2000 1/2 Wall Brick Face Fireplace
Marble Tub Only $ 1475 3‘ x 5‘ Rectangle or 5‘ x 5‘ Corner Garden Tub
Marble Shower Only with Glass Door $ 1950 3‘ x 3‘, 3‘ x 4‘ or 3‘ x 5‘
Granite Kitchen Countertop $2000 Countertop Upgrade
Solid Surface Range $ 300 Appliance Upgrade
Space Saver Microwave (Above Range) $ 300 Appliance Upgrade
Dormer Windows $ 1000 Each
Seal Tight (sm) Package $ 4500 NEW! Expandable Foam Insulation Package
Floor Cover Upgrade
 ( Ceramic Tile Wood Etc )
$ 2000 And up
TOTAL INTERIOR OPTIONS:

HOME EXTERIOR OPTIONS                  Add Desired Upgrades
Double Car Garage (Finished) 22‘ x 22‘ $ 17000 With Overhead Door & 1/2 HP Auto Opener
Metal Roof $ 4000 And up
Limestone Rock Exterior $4000 And up
Metal Freestanding Carport       20‘ x 20‘ $ 2500 4" Slab, 3/8" steel 12" o.c.b.w.
Concrete Parking/Approach      20‘ x 20‘ $ 2000 4" Slab, 3/8" steel 12" o.c.b.w.
Gravel Drive                                  12‘ x 50‘ $ 1000 And up
Concrete Patio                               8‘ x 12‘ $ 600 No Roof Cover
Concrete Patio                            12‘ x 16‘ $ 1200 No Roof Cover
Covered Patio                                8‘ x 12‘ $ 3500  
Covered Patio                             12‘ x 16‘ $ 7000  
TOTAL EXTERIOR OPTIONS:

BUILDING SITE IMPROVEMENTS          Add Needed Improvements
Lot Preparation (Estimate Only) $ 1000 Leveling Of Building Site( needed in most cases )
Excavation (Estimate Only, if required) $ 4000 Remove 2" of Top Soil or Dirt / Replace with 2" Select Fill
Final Grade (Estimate Only) $ 1000 Top Soil Dirt Installed ( needed in most cases )
TOTAL BUILDING SITE IMPROVEMENTS:

UTILITY SERVICES                                Add Needed Services
Water Meter Fee $ 500  Estimate Only
Water Line Installed $ 300  Estimate Only
Sewer Tap Fee $ 500  Estimate Only
Sewer Line Installed $ 300  Estimate Only  
Septic System $ 7000  Estimate Only
TOTAL UTILITY SERVICES:

MISCELLANEOUS OPTIONS                  Add Applicable Fees ! ( if required )
Extended Zone (Travel Charge In Some Cases) $ 2000 60-75 Miles from Lorena, TX
Extended Zone (Travel Charge In Some Cases) Determined by Office

*

Over 75 Miles, TBD by scheduled meeting
Building Permit $ 300 If required, estimate only.
Property Survey ( Before Construction. If Needed ) $ 500 If Required, Estimate Only.
One Lot Sub-Division Survey ( Lot & Block ) $ 1500 If Required, Estimate Only.
Engineered Foundation Designed $ 600 If Required, Estimate Only.
TOTAL MISCELLANEOUS  OPTIONS  

LAND COST ( Total or Payoff ) May Be Included In Some Cases (wac) Subject To LTV

FINANCE OPTIONS                     
 
Permanent Closing Fees $ 4500 est. only
Interim Financing Fees $ 4500 est. only

SUMMARY
BASE PRICE OF HOME
HOME INTERIOR OPTIONS
HOME EXTERIOR OPTIONS
BUILDING SITE IMPROVEMENTS
UTILITY SERVICES
MISCELLANEOUS OPTIONS
LAND COST
FINANCE OPTIONS
TOTAL SALES PRICE